1948
The Petropavlovsk-Kamchatsky (Elizovo) Airport dates back to 1948, when the airport was formed out of the Kamchatka Air Group. The company faced monumental challenges of developing inter-regional transportation.
1957
An artificial runway was constructed in 1957.
1959
Concurrent
construction of a new air terminal, apron, taxiway, hotel, boiler plant, cargo
storage and residential house for airport staff was already underway in 1959.
1969
The
team of the integrated company comprising an air group and an airport was among
the first in the country to master Yak-40 airplane in 1969.
2016
A
new runway was put into operation on June 1, 2016, fitted with all the required
modern radio and lighting control systems, enabling landing approaches under
ICAO Category II.
2016
A
separate legal entity JSC Petropavlovsk-Kamchatsky International Airport
(Elizovo), which accumulated almost all airport operations, carved out from the
integrated company JSC Kamchatka Aviation Enterprise as a result of
restructuring on November 1, 2016.
2017
A
change in service areas of the air terminal took place in 2017. The check-in
area precedes the inspection area because of that.
2017
An
agreement on implementation of the Elizovo Airport construction and operation
project was signed on November 3, 2017 by and between the Kamchatka Territory
Development Corporation and the Airports of Regions Management Company, the
winner in the investment tender for upgrade of the Petropavlovsk-Kamchatsky,
staged by the Kamchatka Territory Development Corporation.
2020
A number of extra anti-epidemic measures have been taken at Petropavlosk-Kamchatsky international airport to prevent the spread of coronavirus infection.